Wednesday, July 20, 2011

Shower and floor tile job

This tile job was how the work should of been performed the first time.  The home owner had contracted this bathroom out to a renovation contractor that stuck flooring sticky tiles on the interior of the shower.  They did not last long and eventually she wanted the job performed correctly.  The photo's show the current progress.  The bathroom is very narrow and its hard to get the camera to capture all of the work that went into this project. 





Finished photos. 





0 comments:

Post a Comment