Today I began a tile job for a friend of mine. I had to rip out the carpet and linoleum prior to putting down hard backer board. The photos illustrate the current progress.
Today I got around to laying the tile. The way the items in the room are situated I had to lay the tiles beneath the stove, refrigerator, and dishwasher and grout in so that the items can be moved back into their holes. Then I will be able to finish tiling the other half of the room. The photos show today's current progress.
The following photos are of the full tile floor with grout and cleaned up. The only remaining task is to seal the grout and replace the trim molding.
No comments:
Post a Comment